Commission Regulation (EU) 2017/1084 of 14 June 2017 amending Regulation (EU) No 651/2014 as regards aid for port and airport infrastructure, notification thresholds for aid for culture and heritage conservation and for aid for sport and multifunctional recreational infrastructures, and regional operating aid schemes for outermost regions and amending Regulation (EU) No 702/2014 as regards the calculation of eligible costs (Text with EEA relevance. )

CELEX
32017R1084
Document type
REG
Sector
Legislation
Date of document
2017-06-14
In force since
2017-07-10
End of validity
2025-12-31
Status
In force

Text

Article-level text, parsed from the formex manifestation.

Article 1

‘7 By way of derogation from paragraphs 1 to 6, in determining whether the ceilings for regional operating aid in outermost regions, as set out in Article 15(4), are respected, only regional operating aid in outermost regions implemented under this Regulation shall be taken into account.’;

Article 12 Monitoring

1 In order to enable the Commission to monitor the aid exempted from notification by this Regulation, Member States, or alternatively, in the case of aid granted to European Territorial Cooperation projects, the Member State in which the Managing Authority is located, shall maintain detailed records with the information and supporting documentation necessary to establish that all the conditions laid down in this Regulation are fulfilled. Such records shall be kept for 10 years from the date on which the ad hoc aid was granted or the last aid was granted under the scheme.

2 In the case of schemes under which fiscal aid is granted automatically, such as those based on tax declarations of the beneficiaries, and where there is no ex ante verification that all compatibility conditions are met for each beneficiary, Member States shall regularly verify, at least ex post and on a sample basis, that all compatibility conditions are met, and draw the necessary conclusions. Member States shall maintain detailed records of the verifications for at least 10 years from the date of the controls.

3 The Commission may request, from each Member State, all the information and supporting documentation which the Commission considers necessary to monitor the application of this Regulation, including the information mentioned in paragraphs 1 and 2. The Member State concerned shall provide the Commission with the requested information and supporting documents within a period of 20 working days from receipt of the request or such longer period as may be fixed in the request.’;

Article 13 Scope of regional aid

This Section shall not apply to: (a) aid which favours activities in the steel sector, the coal sector, the shipbuilding sector or the synthetic fibres sector; (b) aid to the transport sector as well as the related infrastructure, and aid for energy generation, distribution and infrastructure, except for regional investment aid in outermost regions and regional operating aid schemes; (c) regional aid in the form of schemes which are targeted at a limited number of specific sectors of economic activity; schemes aimed at tourism activities, broadband infrastructures or processing and marketing of agricultural products are not considered to be targeted at specific sectors of economic activity; (d) regional operating aid granted to undertakings whose principal activities fall under Section K “Financial and insurance activities” of the NACE Rev. 2 or to undertakings that perform intra-group activities whose principal activities fall under classes 70.10 “Activities of head offices” or 70.22 “Business and other management consultancy activities” of NACE Rev. 2.’;

Article 15 Regional operating aid

1 Regional operating aid schemes in outermost regions, sparsely populated areas and very sparsely populated areas shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled.

2 In sparsely populated areas, the regional operating aid schemes shall compensate for the additional transport costs of goods which have been produced in areas eligible for operating aid, as well as additional transport costs of goods that are further processed in those areas, under the following conditions: (a) the aid is objectively quantifiable in advance on the basis of a fixed sum or per tonne/kilometre ratio or any other relevant unit; (b) the additional transport costs are calculated on the basis of the journey of the goods inside the national border of the Member State concerned using the means of transport which results in the lowest costs for the beneficiary. The aid intensity shall not exceed 100 % of the additional transport costs as set out in this paragraph.

3 In very sparsely populated areas, the regional operating aid schemes shall prevent or reduce depopulation under the following conditions: (a) the beneficiaries have their economic activity in the area concerned; (b) the annual aid amount per beneficiary under all operating aid schemes does not exceed 20 % of the annual labour costs incurred by the beneficiary in the area concerned.

4 In outermost regions, the operating aid schemes shall compensate for the additional operating costs incurred in those regions as a direct result of one or several of the permanent handicaps referred to in Article 349 of the Treaty, where the beneficiaries have their economic activity in an outermost region provided that the annual aid amount per beneficiary under all operating aid schemes implemented under this Regulation does not exceed any of the following percentages: (a) 35 % of the gross value added annually created by the beneficiary in the outermost region concerned; (b) 40 % of the annual labour costs incurred by the beneficiary in the outermost region concerned; (c) 30 % of the annual turnover of the beneficiary realised in the outermost region concerned.’;

Article 56a Aid for regional airports

1 Investment aid to an airport shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in paragraphs 3 to 14 of this Article and in Chapter I are fulfilled.

2 Operating aid to an airport shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in paragraphs 3, 4, 10 and 15 to 18 of this Article and in Chapter I are fulfilled.

3 The airport shall be open to all potential users. In the case of physical limitation of capacity, the allocation shall take place on the basis of pertinent, objective, transparent and non-discriminatory criteria.

4 The aid shall not be granted for the relocation of existing airports or for the creation of a new passenger airport, including the conversion of an existing airfield into a passenger airport.

5 The investment concerned shall not exceed what is necessary to accommodate the medium-term expected traffic on the basis of reasonable traffic forecasts.

6 The investment aid shall not be granted to an airport located within 100 kilometres or 60 minutes travelling time by car, bus, train or high-speed train from an existing airport from which scheduled air services, within the meaning of Article 2(16) of Regulation (EC) No 1008/2008, are operated.

7 Paragraphs 5 and 6 shall not apply to airports with average annual passenger traffic of up to 200000 passengers during the two financial years preceding the year in which aid is actually granted if the investment aid is not expected to result in the airport increasing its average annual passenger traffic to above 200000 passengers within two financial years following the granting of the aid. Investment aid granted to such airports shall comply either with paragraph 11 or with paragraphs 13 and 14.

8 Paragraph 6 shall not apply where the investment aid is granted to an airport situated within 100 kilometres from existing airports from which scheduled air services, within the meaning of Article 2(16) of Regulation (EC) No 1008/2008, are operated, provided the route between each of these other existing airports and the airport receiving the aid necessarily involves either a total travelling time by maritime transportation of at least 90 minutes or air transportation.

9 The investment aid shall not be granted to airports with average annual passenger traffic of more than three million passengers during the two financial years preceding the year in which aid is actually granted. The investment aid shall not be expected to result in the airport increasing its average annual traffic to above three million passengers within two financial years following the granting of the aid.

10 The aid shall not be granted to airports with average annual freight traffic of more than 200000 tonnes during the two financial years preceding the year in which aid is actually granted. The aid shall not be expected to result in the airport increasing its average annual freight traffic to above 200000 tonnes within two financial years following the granting of the aid.

11 The investment aid amount shall not exceed the difference between the eligible costs and the operating profit of the investment. The operating profit shall be deducted from the eligible costs ex ante, on the basis of reasonable projections, or through a claw-back mechanism.

12 The eligible costs shall be the costs relating to the investments in airport infrastructure, including planning costs.

13 The investment aid amount shall not exceed: (a) 50 % of eligible costs for airports with an average annual passenger traffic of one to three million passengers during the two financial years preceding the year in which aid is actually granted; (b) 75 % of the eligible costs for airports with average annual passenger traffic of up to one million passengers during the two financial years preceding the year in which aid is actually granted.

14 The maximum aid intensities set out in paragraph 13 may be increased by 20 percentage points for airports located in remote regions.

15 Operating aid shall not be granted to airports with average annual passenger traffic of more than 200000 passengers during the two financial years preceding the year in which aid is actually granted.

16 The amount of operating aid shall not exceed what is necessary to cover the operating losses and a reasonable profit over the relevant period. The aid shall be granted either in the form of periodic instalments fixed ex ante, which shall not be increased during the period for which the aid is granted, or in the form of amounts defined ex post based on the observed operating losses.

17 Operating aid shall not be paid out in respect of any calendar year during which the annual passenger traffic of the airport exceeds 200000 passengers.

18 The granting of the operating aid shall not be made conditional upon the conclusion of arrangements with specific airlines relating to airport charges, marketing payments or other financial aspects of the airlines' operations at the airport concerned.

Article 56b Aid for maritime ports

1 Aid for maritime ports shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled.

2 The eligible costs shall be the costs, including planning costs, of: (a) investments for the construction, replacement or upgrade of port infrastructures; (b) investments for the construction, replacement or upgrade of access infrastructure; (c) dredging.

3 Costs relating to non-transport related activities, including industrial production facilities active in a port, offices or shops, as well as for port superstructures shall not be eligible costs.

4 The aid amount shall not exceed the difference between the eligible costs and the operating profit of the investment or dredging. The operating profit shall be deducted from the eligible costs ex ante, on the basis of reasonable projections, or through a claw-back mechanism.

5 The aid intensity per investment referred to in point (a) of paragraph 2 shall not exceed: (a) 100 % of the eligible costs where total eligible costs of the project are up to EUR 20 million; (b) 80 % of the eligible costs where total eligible costs of the project are above EUR 20 million and up to EUR 50 million; (c) 60 % of the eligible costs where total eligible costs of the project are above EUR 50 million and up to the amount laid down in point (ee) of Article 4(1). The aid intensity shall not exceed 100 % of the eligible costs determined in point (b) of paragraph 2 and point (c) of paragraph 2 up to the amount laid down in point (ee) of Article 4(1).

6 The aid intensities laid down in points (b) and (c) of the first subparagraph of paragraph 5 may be increased by 10 percentage points for investments located in assisted areas fulfilling the conditions of point (a) of Article 107(3) of the Treaty and by 5 percentage points for investments located in assisted areas fulfilling the conditions of point (c) of Article 107(3) of the Treaty.

7 Any concession or other entrustment to a third party to construct, upgrade, operate or rent aided port infrastructure shall be assigned on a competitive, transparent, non-discriminatory and unconditional basis.

8 The aided port infrastructure shall be made available to interested users on an equal and non-discriminatory basis on market terms.

9 For aid not exceeding EUR 5 million, the maximum amount of aid may be set at 80 % of eligible costs, as an alternative to application of the method referred to in paragraphs 4, 5 and 6.

Article 56c Aid for inland ports

1 Aid for inland ports shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled.

2 The eligible costs shall be the costs, including planning costs, of: (a) investments for the construction, replacement or upgrade of port infrastructures; (b) investments for the construction, replacement or upgrade of access infrastructure; (c) dredging.

3 Costs relating to non-transport related activities, including industrial production facilities active in a port, offices or shops, as well as for port superstructures shall not be eligible costs.

4 The aid amount shall not exceed the difference between the eligible costs and the operating profit of the investment or dredging. The operating profit shall be deducted from the eligible costs ex ante, on the basis of reasonable projections, or through a claw-back mechanism.

5 The maximum aid intensity shall not exceed 100 % of the eligible costs up to the amount laid down in point (ff) of Article 4(1).

6 Any concession or other entrustment to a third party to construct, upgrade, operate or rent aided port infrastructure shall be assigned on a competitive, transparent, non-discriminatory and unconditional basis.

7 The aided port infrastructure shall be made available to interested users on an equal and non-discriminatory basis on market terms.

8 For aid not exceeding EUR 2 million, the maximum amount of aid may be set at 80 % of eligible costs, as an alternative to application of the method referred to in paragraphs 4 and 5.’;

Article 2

In Article 7(1) of Regulation (EU) No 702/2014 the following sentence is added: ‘The amounts of eligible costs may be calculated in accordance with the simplified cost options set out in Regulation (EU) No 1303/2013 of the European Parliament and of the Council , provided that the operation is at least partly financed through the EAFRD and that the category of costs is eligible according to the relevant exemption provision.

Article 3

This Regulation shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.

Relations

What this act cites, and what cites it.

Show relations

Versions

Point-in-time consolidated versions of this act.

Show versions