Directive (EU) 2024/1711 of the European Parliament and of the Council of 13 June 2024 amending Directives (EU) 2018/2001 and (EU) 2019/944 as regards improving the Union’s electricity market design (Text with EEA relevance)
Text
Article-level text, parsed from the formex manifestation.
Article 1 Amendment to Directive (EU) 2018/2001
In Directive (EU) 2018/2001, Article 4(3), the second subparagraph is replaced by the following: ‘To that end, with regard to direct price support schemes, support shall be granted in the form of a market premium, which could be, inter alia, sliding or fixed. The second subparagraph of this paragraph shall not apply to support for electricity from the sources listed in Article 19d(4) of Regulation (EU) 2019/943, to which Article 19d(1) of that Regulation applies.’.
Article 4 Free choice of supplier
Member States shall ensure that all customers are free to purchase electricity from suppliers of their choice. Member States shall ensure that all customers are free to have more than one electricity supply contract or energy sharing agreement at the same time, and that, for that purpose, customers are entitled to have more than one metering and billing point covered by the single connection point for their premises. Where technically feasible, smart metering systems deployed in accordance with Article 19 may be used to allow customers to have more than one electricity supply contract or more than one energy sharing agreement at the same time.’
Article 6a Flexible connection agreements
1 The regulatory authority or another competent authority where a Member State has so provided shall develop a framework for transmission system operators and distribution system operators to offer the possibility of establishing flexible connection agreements in areas where there is limited or no network capacity availability for new connections as published in accordance with Article 31(3) and Article 50(4a), first subparagraph, of Regulation (EU) 2019/943. That framework shall ensure that: (a) as a general rule, flexible connections do not delay the network reinforcements in the identified areas; (b) a conversion from flexible to firm connection agreements once the network is developed is ensured on the basis of established criteria; and (c) for areas where the regulatory authority or another competent authority where a Member State has so provided, deems network development not to be the most efficient solution, enable, where relevant, flexible connection agreements as a permanent solution, including for energy storage.
2 The framework referred to in paragraph 1 may ensure that flexible connection agreements specify at least the following: (a) the maximum firm injection and withdrawal of electricity from and to the grid, as well as the additional flexible injection and withdrawal capacity that can be connected and differentiated by time blocks throughout the year; (b) the network charges applicable to both the firm and flexible injection and withdrawal capacities; (c) the agreed duration of the flexible connection agreement and the expected date for granting connection to the entire requested firm capacity. The system user connecting through a flexible grid connection shall be required to install a power control system that is certified by an authorised certifier.’
Article 15a Right to energy sharing
1 Member States shall ensure that all households, small enterprises and medium-sized enterprises, public bodies and, where a Member State has so decided, other categories of final customer have the right to participate in energy sharing as active customers in a non-discriminatory manner, within the same bidding zone or a more limited geographical area, as determined by that Member State.
2 Member States shall ensure that active customers are entitled to share renewable energy between themselves based on private agreements or through a legal entity. Participation in energy sharing shall not constitute the primary commercial or professional activity of active customers engaged in energy sharing.
3 Active customers may appoint a third party as an energy sharing organiser for the purposes of: (a) communicating about the energy sharing arrangements with other relevant entities, such as suppliers and network operators, including on aspects related to the applicable tariffs and charges, taxes or levies;. (b) providing support for managing and balancing behind-the-meter flexible loads, distributed renewable energy generation and storage facilities that are part of the relevant energy sharing arrangement; (c) contracting and billing active customers that participate in energy sharing; (d) installation and operation, including metering and maintenance, of the renewable energy generation or storage facility. The energy sharing organiser or another third party may own or manage a storage or renewable energy generation facility of up to 6 MW, without being considered to be an active customer, except where it is one of the active customers participating in the energy sharing project. The energy sharing organiser shall provide non-discriminatory services and transparent prices, tariffs, and terms of services. With regard to the first subparagraph, point (c), of this paragraph, Articles 10, 12 and 18 shall apply. Member States shall lay down the regulatory framework for the application of this paragraph.
4 Member States shall ensure that active customers participating in energy sharing: (a) are entitled to have the shared electricity injected into the grid deducted from their total metered consumption within a time interval no longer than the imbalance settlement period and without prejudice to applicable non-discriminatory taxes, levies and cost-reflective network charges; (b) benefit from all consumer rights and obligations as final customers under this Directive; (c) are not required to comply with supplier obligations, where renewable energy is shared between households with an installed capacity up to 10,8 kW for single households and up to 50 kW for multi-apartment blocks; (d) have access to voluntary template contracts with fair and transparent terms and conditions for energy sharing agreements; (e) in the event of a conflict arising from an energy-sharing agreement, have access to out-of-court dispute settlement with other participants in the energy sharing agreement in accordance with Article 26; (f) are not subject to unfair and discriminatory treatment by market participants or their balance responsible parties; (g) are informed of the possibility of changes in bidding zones in accordance with Article 14 of Regulation (EU) 2019/943 and of the fact that the right to share renewable energy is restricted in accordance with paragraph 1 of this Article; (h) notify energy sharing arrangements to the relevant system operators and market participants, including the relevant suppliers either directly or through an energy sharing organiser. Member States may adapt the thresholds referred to in point (c) of the first subparagraph in accordance with the following: (a) in the case of single households, the threshold may be increased up to 30 kW; (b) in the case of multi-apartment blocks the threshold may be increased up to 100 kW or, in the case of duly justified specific circumstances due to a reduced average size of multi-apartment blocks, decreased to a minimum of 40 kW.
5 Where other categories of final customer participating in energy sharing schemes are larger than small and medium-sized enterprises, the following additional conditions shall apply: (a) the size of the installed capacity of the generation facility associated with the energy sharing scheme is to be a maximum of 6 MW; (b) the energy sharing takes place within a local or limited geographical area, as defined by the Member State concerned.
6 Member States shall ensure that relevant transmission system operators or distribution system operators or other designated bodies: (a) monitor, collect, validate and communicate metering data related to the shared electricity with relevant final customers and market participants at least every month, and in accordance with Article 23, and for that purpose, put in place the appropriate IT systems; (b) provide a relevant contact point to: (i) register energy sharing arrangements; (ii) make available practical information for energy sharing; (iii) receive information on relevant metering points, changes in location and participation; and (iv) where applicable, validate calculation methods in a clear, transparent and timely manner.
7 Member States shall take appropriate and non-discriminatory measures to ensure that vulnerable customers and customers affected by energy poverty can access energy sharing schemes. Those measures may include financial support measures or production allocation quota.
8 Member States shall ensure that energy sharing projects owned by public authorities make the shared electricity accessible to vulnerable or energy poor customers or citizens. When doing so, Member States shall do their utmost to promote that the amount of that accessible energy is at least 10 % on average of the energy shared.
9 Member States may promote the introduction of plug-in mini-solar systems of up to 800 W capacity in and on buildings.
10 The Commission shall provide guidance to the Member States without increasing the administrative burden in order to facilitate the establishment of a standardised approach with regard to energy sharing and ensure a level playing field for renewable energy communities and citizen energy communities.
11 This Article shall be without prejudice to the right of customers to choose their supplier in accordance with Article 4 and to applicable national rules on the authorisation of suppliers.’
Article 18a Supplier risk management
1 Regulatory authorities or, where a Member State has designated an alternative independent competent authority for that purpose, such a designated competent authority, taking into account the size of the supplier or the market structure and including, if relevant, by carrying out stress tests shall ensure that suppliers: (a) have in place and implement appropriate hedging strategies, to limit the risk of changes in wholesale electricity supply to the economic viability of their contracts with customers, while maintaining liquidity on and price signals from short-term markets; (b) take all reasonable steps to limit their risk of supply failure.
2 Supplier hedging strategies may include the use of power purchase agreements as defined in Article 2, point (77), of Regulation (EU) 2019/943 or other appropriate instruments, such as forward contracts. Where sufficiently developed markets for power purchase agreements exist which allow effective competition, Member States may require that a share of suppliers’ risk exposure to changes in wholesale electricity prices is covered using power purchase agreements for electricity generated from renewable energy sources matching the duration of their risk exposure on the consumer side, subject to compliance with Union competition law.
3 Member States shall endeavour to ensure the accessibility of hedging products for citizen energy communities and renewable energy communities and to put in place enabling conditions for that purpose.’
Article 27a Supplier of last resort
1 Where Member States have not already put in place a regime with regard to suppliers of last resort, they shall introduce such a regime to ensure continuity of supply at least for household customers. Suppliers of last resort shall be appointed in a fair, transparent and non-discriminatory procedure.
2 Final customers who are transferred to suppliers of last resort shall continue to benefit from all of their rights as customers as laid down in this Directive.
3 Member States shall ensure that suppliers of last resort communicate their terms and conditions to transferred customers without delay and ensure a seamless continuity of service for those customers for a period needed to find a new supplier, and at least six months.
4 Member States shall ensure that final customers are provided with information and encouragement to switch to a market-based offer.
5 Member States may require a supplier of last resort to supply electricity to household customers and small enterprises and medium-sized enterprises who do not receive market-based offers. In such cases, the conditions set out in Article 5 shall apply.’
Article 28a Protection from disconnections
1 Member States shall ensure that vulnerable customers and customers affected by energy poverty are fully protected from electricity disconnections, by taking the appropriate measures, including the prohibition of disconnections or other equivalent actions. Member States shall provide such protection as part of their policy with regard to vulnerable customers pursuant to Article 28(1) and without prejudice to the measures set out in Article 10(11). When notifying the Commission of their transposition measures of this Directive, Member States shall explain the relationship between the first subparagraph and the corresponding parts of national transposition instruments.
2 Member States shall ensure that suppliers do not terminate contracts and do not disconnect customers on the grounds on which customers have submitted a complaint in accordance with Article 10(9) or which are subject to an out-of-court dispute settlement mechanism in accordance with Article 26. Such a complaint or the use of such a mechanism shall not affect the parties’ contractual rights and obligations. Member States may take appropriate measures to avoid an abuse of process.
3 Member States shall take appropriate measures referred to in paragraph 1 to enable customers to avoid disconnection, which may include: (a) promoting voluntary codes for suppliers and customers on preventing and managing cases of customers in arrears; those arrangements may concern support for customers in managing their energy use and costs, including flagging unusual high energy spikes or use in winter and summer seasons, offering appropriate flexible payment plans, debt advice measures, self-metering readings, and improved communication with customers and support agencies; (b) promoting customers’ education and awareness of their rights with regard to debt management; (c) access to finance, vouchers or subsidies to support the payment of bills; (d) encouraging and facilitating the provision of meter readings every three months, or where relevant for shorter billing periods, where a system of regular self-reading by the final customer has been implemented to meet the obligations of points 2(a) and (b) of Annex I in relation to the frequency of billing and the provision of billing information.’
Article 66a Access to affordable energy during an electricity price crisis
1 The Council may, acting on a proposal from the Commission, by means of an implementing decision declare a regional or Union-wide electricity price crisis, if the following conditions are met: (a) the existence of very high average prices in wholesale electricity markets of at least two and a half times the average price during the previous five years, and at least 180 EUR/MWh which is expected to continue for at least six months, the calculation of the average price during the previous five years not taking into account those periods where a regional or Union-wide electricity price crisis was declared; (b) sharp increases in electricity retail prices in the range of 70 % occur which are expected to continue for at least three months.
2 The implementing decision referred to in paragraph 1 shall specify its period of validity which may be for a period of up to one year. That period may be extended in accordance with the procedure laid down in paragraph 8 for consecutive periods of up to one year.
3 The declaration of a regional or Union-wide electricity price crisis pursuant to paragraph 1 shall ensure a fair competition and trade across all Member States affected by the implementing decision so that the internal market is not unduly distorted.
4 Where the conditions laid down in paragraph 1 are fulfilled, the Commission shall submit a proposal to declare a regional or Union-wide electricity price crisis which shall include the proposed period of validity of the implementing decision.
5 The Council, acting by a qualified majority, may amend a Commission proposal submitted pursuant to paragraph 4 or 8.
6 Where the Council has adopted an implementing decision pursuant to paragraph 1, Member States may, for the duration of the validity of that decision, apply temporary targeted public interventions in price setting for the supply of electricity to small enterprises and medium-sized enterprises. Such public interventions shall: (a) be limited to at most 70 % of the beneficiary’s consumption during the same period of the previous year and retain an incentive for demand reduction; (b) comply with the conditions set out in Article 5(4) and (7); (c) where relevant, comply with the conditions set out in paragraph 7 of this Article; (d) be designed to minimise any negative fragmentation of the internal market.
7 Where the Council has adopted an implementing decision pursuant to paragraph 1 of this Article, Member States may for the duration of the validity of that decision, by way of derogation from Article 5(7), point (c), when applying targeted public interventions in price setting for the supply of electricity pursuant to Article 5(6) or to paragraph 6 of this Article, exceptionally and temporarily set a price for the supply of electricity which is below cost provided that the following conditions are fulfilled: (a) the price set for household customers only applies, at most, to 80 % of median household consumption and retains an incentive for demand reduction; (b) there is no discrimination between suppliers; (c) suppliers are compensated for supplying below cost in a transparent and non-discriminatory manner; (d) all suppliers are eligible to provide offers for the price for the supply of electricity which is below cost on the same basis; (e) measures proposed do not distort the internal electricity market.
8 In due time before the expiry of the period of validity specified pursuant to paragraph 2, the Commission shall assess whether the conditions laid down in paragraph 1 continue to be fulfilled. If the Commission considers that the conditions laid down in paragraph 1 continue to be fulfilled, it shall submit to the Council a proposal to extend the period of validity of an implementing decision adopted pursuant to paragraph 1. Where the Council decides to extend the period of validity, paragraphs 6 and 7 shall apply during such extended period. The Commission shall continuously assess and monitor the impact resulting from any measures adopted under this Article and publish on a regular basis the results of such assessments.’
Article 3 Transposition
1 Member States shall bring into force the laws, regulations and administrative provisions necessary to comply with this Directive by 17 January 2025. By way of derogation from the first subparagraph of this paragraph, Member States shall bring into force the laws, regulations and administrative provisions necessary to comply with Article 2, points (2) and (5), by 17 July 2026. They shall immediately inform the Commission thereof. When Member States adopt those measures, they shall contain a reference to this Directive or shall be accompanied by such reference on the occasion of their official publication. The methods of making such reference shall be laid down by Member States.
2 Member States shall communicate to the Commission the text of the measures of national law which they adopt in the field covered by this Directive.
Article 4 Entry into force
This Directive shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.
Article 5 Addressees
This Directive is addressed to the Member States.
Relations
What this act cites, and what cites it.
Show relationsVersions
Point-in-time consolidated versions of this act.
Show versions