Skip to content
Seqlense EUR-Lex

2012/141/EU: Commission Implementing Decision of 6 March 2012 on the financing of emergency surveillance measures for rabies in northern Greece (notified under document C(2012) 1354)

CELEX
32012D0141
Document type
DEC_IMPL
Sector
Legislation
Date of document
2012-03-06
In force since
2012-01-27
Status
In force

Text

Article-level text, parsed from the formex manifestation.

Article 1

The ‘Emergency plan for the surveillance of rabies’ submitted by Greece to the Commission on 27 January 2012 (‘the plan’) is hereby approved for the grant of a Union financial contribution for the period from 27 January 2012 to 31 December 2012 (‘the financial contribution’).

Article 2

1 The financial contribution shall not exceed, in total, EUR 60000.

2 The financial contribution shall include a lump sum of EUR 5 per wild animal collected and sent for rabies investigation under the plan.

3 The financial contribution shall be at the rate of 75 % of the costs to be incurred under the plan for the laboratory tests for the detection of rabies infection and for the isolation and characterisation of rabies virus. Those costs shall include: (a) the costs paid for the purchase of test kits, reagents and all consumables used to carry out the laboratory tests; (b) overheads equal to 7 % of the total sum of the costs referred to in point (a). However, the maximum amount of the costs to be reimbursed for a fluorescent antibody test (FAT) shall not exceed, in total, EUR 12 per test.

4 The financial contribution shall be at the rate of 75 % of the costs for personnel specifically hired for carrying out the laboratory tests referred to in paragraph 3. Those costs shall include: (a) the fee paid for the personnel or their actual salaries plus social security charges and other statutory costs included in their remuneration; (b) overheads equal to 7 % of the total sum of the costs referred to in point (a). However, the maximum amount of the costs to be reimbursed for such personnel shall not exceed, in total, EUR 25000.

Article 3

1 The financial contribution shall be granted provided that Greece: (a) implements the plan in accordance with the relevant provisions of Union law, including rules on competition, the award of public contracts and State aid; (b) submits interim technical reports to the Commission in accordance with Annex I by the latest on: (i) 31 May 2012, covering the period from 27 January 2012 to 30 April 2012; (ii) 30 September 2012, covering the period from 1 May 2012 to 31 August 2012; (c) submits a final technical report and a financial report in accordance with Annexes I and II, covering the period from 27 January 2012 to 31 December 2012, by the latest on 28 February 2013; (d) implements satisfactorily the measures foreseen in the plan.

2 In the event that Greece does not comply with the conditions laid down in paragraph 1, the Commission shall reduce the financial contribution taking into account the nature and gravity of the non-compliance and the financial loss incurred by the Union.

Article 4

This Decision shall apply from 27 January 2012.

Article 5

This Decision is addressed to the Hellenic Republic.

Relations

What this act cites, and what cites it.

Show relations

Versions

Point-in-time consolidated versions of this act.

Show versions