Skip to content
Seqlense EUR-Lex

2007/492/EC: Commission Decision of 24 January 2007 on the State aid C 38/2005 (ex NN 52/2004) implemented by Germany for the Biria Group (notified under document number C(2007) 130) (Text with EEA relevance)

CELEX
32007D0492
Document type
DEC_ENTSCHEID
Sector
Legislation
Date of document
2007-01-24
In force since
2007-07-13
Status
In force

Text

Article-level text, parsed from the formex manifestation.

Article 1

The state aid for Bike Systems GmbH & Co. Thüringer Zweiradwerk KG, Sachsen Zweirad GmbH and Biria GmbH (now Biria AG) is incompatible with the common market. The aid consisted of the following measures: (a) Measure 1: a silent participation of EUR 2070732 provided to Bike Systems GmbH & Co. Thüringer Zweiradwerk KG. The aid element corresponds to the difference between the reference interest rate plus 1000 basis points and the remuneration against which the silent participation was provided (fixed remuneration plus 50 % of the variable remuneration); (b) Measure 2: a guarantee of EUR 4.480m to Sachsen Zweirad GmbH. The aid element corresponds to the difference between the reference interest rate plus 800 basis points and the interest rate at which the guaranteed loan was provided; (c) Measure 3: a guarantee of EUR 19.9m to Biria GmbH (now Biria AG). The aid element corresponds to the difference between the reference interest rate plus 700 basis points and the interest rate at which the guaranteed loan was provided.

Article 2

1 Germany shall take all necessary measures to recover from the beneficiary the aid referred to in Article 1 and unlawfully made available to the beneficiary.

2 The silent participation and the guarantee for Biria GmbH (now Biria AG) shall be discontinued within two months following notification of this decision.

3 Recovery shall be effected without delay and in accordance with the procedures of national law provided that they allow the immediate and effective execution of the decision.

4 The aid to be recovered shall include interest from the date on which it was at the disposal of the beneficiary until the date of its recovery.

5 Interest shall be calculated in conformity with Chapter V of Commission Regulation (EC) No 794/2004 .

Article 3

Germany shall inform the Commission, within two months following notification of this decision, of the measures already taken or planned to comply with it. It shall provide this information using the questionnaire annexed to this Decision. In particular, it shall submit to the Commission all documents proving that recovery proceedings have been initiated against the beneficiary of the unlawful aid.

Article 4

This decision is addressed to the Federal Republic of Germany.

Relations

What this act cites, and what cites it.

Show relations

Versions

Point-in-time consolidated versions of this act.

Show versions